What Does A Cp Of 1.5 Mean?

What does a CP value mean?

Cp is a ratio of the specification spread to the process spread.

The process spread is often defined as the 6-sigma spread of the process (that is, 6 times the within-subgroup standard deviation).

Higher Cp values indicate a more capable process.

When the specification spread is less than the process spread, Cp is low..

What is the minimum acceptable value for CP?

A value of less than 1 is unacceptable, with values greater than 1.33 (1.25 for one-sided specification limits) widely accepted as the minimum acceptable value, and values greater than 1.50 (1.45 for one-sided specification limits) for critical parameters (Montgomery, 2012) .

How many Sigma is 1.67 Cpk?

6 sigmaCp = Cpk = 1.67. The sigma level is now 5 – the specifications are five standard deviations away from the average. The out of specification has decreased to 0.57 ppm. The fourth curve represents that magical 6 sigma level.

What is a good CP and CPK?

We generally want a Cpk of at least 1.33 [4 sigma] or higher to satisfy most customers. Cpk can have an upper and lower value reported. If the upper value is 2 and the lower is 1, we say it has been shifted to the left.

Can CP CPK be negative?

Both Cpk and Ppk can be a negative numbers. It means that, on average, the process is not meeting customer requirements.

How do you read CP and CPK?

The higher the Cpk, the better is the capability of the process to meet its requirements. In the industry, a Cpk of less than 1.66 needs a closer look. A Cpk that’s less than 1.33 needs some action to make it higher, and a Cpk of less than 1.0 means that the process is not capable of meeting its requirements.

What is CP CPK?

Cp and Cpk, commonly referred to as process capability indices, are used to define the ability of a process to produce a product that meets requirements. … Specifications are normally defined in terms of nominal (+/-) tolerances or ranges (low to high.

What does PPK of 1.33 mean?

meeting customer requirementsPpk < 1.33. The process is substandard for meeting customer. requirements. Process improvements must be given high.

How do you determine if a process is capable?

All the data points fall well within the specification limits with a normal distribution. A process where almost all the measurements fall inside the specification limits is deemed a capable process.

What does it mean if capability index CP is less than 1?

A Process Capability Index. A value of 1 indicates the process variation exactly equals the tolerance. … Values of less than 1 indicate the allowable variation (the tolerance) is less than the process variation. Values of more than 1 indicate that the process variation is less than the tolerance.

What is CP value for a Six Sigma process?

The higher the Cp, the lower the variability with respect to the specification limits. In a process qualified as a Six Sigma process (i.e., one that allows plus or minus six standard deviations within the specifications limits), the Cp is greater than or equal to 2.0.

What does a CP of 1 mean?

A Cp of one indicates that the width of the process and the width of the specification are the same. A Cp of less than one indicates that the process spread is greater than the specification. This means that some of the data lies outside the specification.

What does a Cpk of 1.67 mean?

The Capability Index, Cpk. The outcome of a Process Capability study is a single metric, which provides an indication of the ability of a process to consistently provide output which is within required specifications. CPK <1.00 (Poor, incapable) 1.00< CPK <1.67 (Fair) CPK >1.67 (Excellent, Capable)

What is CPK and how is it calculated?

Cpk is a process capability index used to measure what a process is capable of producing. … The formula for the calculation of Cpk is Cpk = min(USL – μ, μ – LSL) / (3σ) where USL and LSL are the upper and lower specification limits, respectively.

What does CP of 1.33 mean?

Process capability indexProcess capability index (Cpk) is a statistical tool, to measure the ability of a process to produce output within customer’s specification limits. … Cpk = or >1.33 indicates that the process is capable and meets specification limits.

What is CP SPC?

Capability (Cp) and performance (Cpk) charts illustrate a process’s ability to meet specifications. Although SPC control charts can reveal whether a process is stable, they do not indicate whether the process is capable of producing acceptable output—and whether it is performing to capability.